Most timesheet problems are cheap to fix on Friday and expensive to fix at month end. On Friday, people remember which client the Tuesday call was for. Four weeks later, nobody does, and the invoice goes out with a guess in it. A weekly timesheet review is the habit that closes that gap, and it does not need to take an afternoon.
This is a fixed 20-minute routine for whoever runs agency operations. It works with any agency time tracking software that has a dashboard, filterable reports and editable entries, and it is designed to be run every week by the same person, in the same order.
Why a weekly timesheet review beats a monthly clean-up
Monthly clean-ups fail for a simple reason: memory decays faster than the calendar moves. An entry that says "call" with no project is easy to file a few days later and nearly impossible to file a month later. The longer the gap, the more the review turns into reconstruction.
A weekly rhythm also spreads the work. Twenty minutes every Friday is far easier to protect than a full day at month end, and it means the numbers you look at mid-month are already close to right. That is the real point of timesheet accuracy: not a tidy archive, but figures you can use while there is still time to act on them.
A timesheet review is not an audit of people. It is a check of the record, done while the people who made it can still explain it.
Before you start: decide what "done" means
A review without a definition of done drifts. Before the first session, write down what a complete week looks like for your workspace. A typical definition:
- Every working day has time on it for every active person.
- Every entry has a project and a task.
- Billable marks match the project they sit on, unless there is a reason.
- No entry runs suspiciously long, such as a timer left on overnight.
The best way to prevent incomplete timesheets is to make most of these impossible in the first place. If the workspace requires a project and a task when an entry is saved, the second check above mostly disappears. Stop-time field enforcement covers which fields to require and why the check belongs on STOP rather than START.
The 20-minute routine, step by step
Run the steps in this order. Each one narrows the list for the next.
00-04 Dashboard, last week, everyone -> spot days with no time
04-08 Message the people with gaps -> they fill their own days
08-13 Detailed report, scan durations -> fix overlong entries
13-17 Report filtered by billability -> correct wrong marks in bulk
17-20 Summary by client and project -> sanity-check the totalsStep 1: find the missing days (4 minutes)
Open the dashboard for last week with everyone selected. Look at how many working days actually carry time. A gap is almost always somebody forgetting to log, not a quiet week. Note the names; do not fill their time for them.
Step 2: ask, do not reconstruct (4 minutes)
Send each person with a gap one short message naming the day. They know what they did; you do not. People who fill their own gaps a few times tend to start logging on the day, which is the habit you actually want.
Step 3: catch overlong entries (5 minutes)
Open the detailed report for the same week and look for the longest entries. A nine-hour entry on a single task with no description is usually a forgotten timer. Correct the end time where the person can confirm it. Forgotten timers explains how to stop these happening in the first place.
Step 4: correct billable marks in bulk (4 minutes)
Filter the report to billable entries on internal projects, then to internal entries on client projects. Most results are mistakes; a few are deliberate, such as rework you chose not to charge. Select the mistakes and switch them together rather than one at a time.
Step 5: sanity-check the totals (3 minutes)
Group the summary by client, then by project. You are not checking every number; you are looking for anything that surprises you. A client with twice their usual hours, or a project with none at all, is worth one question before the week is closed.
What to look for, in one table
The same handful of problems turns up in almost every review. Knowing them by sight is what keeps the routine to 20 minutes.
| What you see | Likely cause | Fix |
|---|---|---|
| A working day with no time | Person forgot to log | Ask them to add it manually |
| One very long entry | Timer left running | Confirm and correct the end time |
| Billable entry on an internal project | Mark switched by accident | Switch back in bulk |
| Entry on the wrong client's project | Picked from a long list | Re-file to the right project |
| Many entries with no description | Description not required | Consider requiring it |
Keeping the review short as the team grows
The routine above works for a small team as written. As headcount grows, two adjustments keep it at roughly the same length.
First, split by group rather than by person. Review one team at a time, or ask each team lead to run steps 1 to 3 for their own people and leave steps 4 and 5 to operations. Second, tighten the workspace rules whenever the same problem shows up three weeks running. If you keep filing entries with no task, require the task. Each rule you add removes a recurring line from the review.
The review should also feed your billing. A billable hours tracker is only as good as the week it was reviewed in; when every week is closed on Friday, month-end exports need no clean-up. For the export side, see preparing CSV, Excel and PDF for invoices and audits.
How Tickr handles the weekly review
Tickr's dashboard shows Tracked and Billable totals for a chosen period, such as Last week, next to the period before, and a Days with time figure that counts how many of the workspace's working days carry any time. Admins and Owners can switch the member filter to everyone, so the same screen answers for the whole workspace. The working week is set in workspace settings.
Reports filter by period, project, client, task, member, tags and billability. The Detailed tab lists every entry and lets you select rows to change the project, change the billable mark or delete them in one go; the Summary tab groups by project, client, task, member, tag, billability or description. Required fields are a workspace setting: if a description, project, task or tag is required, STOP and ADD refuse until it is filled in and name what is missing. On the tracker, every column of an entry can be edited in place. The docs cover each screen, and why required fields belong on STOP, not START explains the reasoning.
